Building Updates
December 3, 2021
Please click here for a summary of bids that were presented for the Field House project.
July 14, 2021
Please click here for a summary of bids that were presented for our elementary building project.
May 6, 2021
The NLSD Artificial Turf Field Bid Opening will be live-streamed on YouTube on May 6, 2021, at 2:00PM.
To watch the Bid Opening Session, click on the following YouTube Link:
Please click here for the Act 34 booklet on the construction being planned by NLSD.
The virtual links for the hearing are below. The full advertisement from the Lebanon Daily News also posted below.
The hearing will be available for viewing purposes only through the following YouTube link:
To participate in or comment during the hearing, the hearing will be available via Zoom at: https://zoom.us/j/95890589440?pwd=Um9sV0pta2xYOUI2ZnN3ZnpGZFJ3UT09. The Passcode is “Viking”.
December 2, 2020
Click here to see the December 1 School Board Meeting. Crabtree-Rohrbaugh's presentation is at the 22 minute mark.
November 18, 2020
The Crabtree-Rohrbaugh update on the new elementary building can be watched on https://www.norleb.org/school-board/virtual-board-meeting-information
Nov 18 Presentation
November 1, 2020
Click here to access the Presentation from Crabtree Rohrbaugh at the November School Board meeting. This presentation focuses on savings from the proposed options.
October 23, 2020
The final report from the study will be available in early November and will be posted here.
October 22, 2020
Crabtree Rohrbaugh's public presentation can be found below. The next public presentation will be held November 18 at 6:30. We will again have limited seating available and will live-stream via Youtube.
Oct 21 Presentation
Oct 21 Public Input Results
October 20, 2020
There will be a public presentation on the potential construction of a new elementary building on October 21, 2020 at 6:30 p.m. Limited seating is available in the auditorium or you may watch the presentation at https://youtu.be/uZVCv1JwKFM
There will be an interactive portion of the presentation even if you attend virtually.
During the March 2020 School Board meeting, the NLSD School Board voted to utilize the services of Crabtree Rohrbaugh to conduct a survey on the existing NLSD buildings and to explore options that the Board should consider for future building renovations or projects. Information from that study is below.
Click here to access the Presentation from Crabtree Rohrbaugh at the April School Board meeting. This presentation outlines the study process and provides sample timelines.
This Powerpoint was provided to the Board, but no presentation was given due to COVID-19.